Complete Pool Opening
- Clean and remove winter cover
- Place all drain plugs in equipment
- Turn on Gas
- Turn on Electrical at breaker
- Install Ladders & Handrails
- Turn on pump & heater plus any additional water features (Slides/deck jets) to make sure they run properly
- Add opening chemicals (additional cost)
Complete Pool Closing
- Remove water below skimmer
- Remove drain plugs from all equipment and place in skimmer)
- Position 7-way head to winterize
- Shut off Gas
- Shut off Electric at the breaker
- Remove Ladders & Handrails
- Install Winter Cover
- Place all cleaning equipment, poles, handrails etc in clients storage area
- Add winterizing chemicals (additional cost)
One FREE Mid Season Check Up
A Certified Technician will perform a full vacuum, chemical test and equipment check.
Note: For all seasons, additional chemicals will be billed separately. Customer is responsible for raising water level to the middle of the skimmer