Complete Pool Opening
- Clean and remove winter cover
- Place all drain plugs in equipment
- Turn on Gas
- Turn on Electrical at breaker
- Install Ladders & Handrails
- Turn on pump & heater plus any additional water features (Slides/deck jets) to make sure they run properly
- Add basic opening chemicals
- Full Balancing chemicals (Additional Charge-Billed Monthly)
**Customer is responsible for raising water level to the middle of the skimmer.
Complete Pool Closing
- Remove water below skimmer
- Remove drain plugs from all equipment (and place in skimmer)
- Position 7-way head to winterize
- Shut off Gas
- Shut off Electric at the breaker
- Remove Ladders & Handrails
- Install Winter Cover
- Place all cleaning equipment, poles, handrails etc in clients storage area
- Add basic closing chemicals (included)
- Full Balancing Chemicals (Additional Charge-Monthly Billing). Additional chemicals will be billed monthly.
8 Biweekly Maintenance Visits
(No Vacuuming)
A Certified Technician will perform a chemical test, a filter cleaning, chemical application, filter cleaning and system checks.
Early access scheduling
10% off pool toys and accessories: Pumps, Filters, Heaters, Auto Vacuums, Floats, Life Jackets and so much more!
$200 Savings Overall!
Emergency Visits Subscription
$50.00
Buy now